RSA 157-A:9-a Inspection Reports and Certificates; Fee.
Title: XII - PUBLIC SAFETY AND WELFARE
Chapter: 157-A - BOILERS AND PRESSURE VESSELS
I. Subsequent to the inspection of a boiler or pressure vessel, an inspector shall file with the commissioner an inspection report on a form prescribed by the commissioner indicating whether or not the inspected object is certifiable and shall communicate the results of such inspection to the owner or the owner's designee. When an object passes inspection, the commissioner shall furnish an inspection certificate to its owner or the owner's designee on a form prescribed by the commissioner. A fee of $50 shall be charged for each certificate. If the fee is not paid within 30 days of the date on which the certificate is issued, the certificate shall be void.
II. If the object fails the inspection, the inspector shall furnish the owner or the owner's designee an appropriate abstra